Design & Build Al Khor Expressway Project
- Location: Doha / QATAR
- Client: ASHGHAL - Public Works Authority
- Main Contractor: Tekfen Construction and Installation Co. Inc.
- Consultant: KEO International Consultants
- Duration: 24 Months
- Production & Installation of Precast Bridge Parapets: 5.300 mt.
- Concrete: 3.150 m3
- Surface Preparetion & Painting: 23.000 m2
- GRC Works: 3.425 mt.
- Monorail Guardrails: 1.000 mt.
- MSE Wall Production & Installation: 11.082 m2
- Panels: 3.700 Pieces
- Selected Fill: 6.500 m3
- Precast F Type Barriers: 1.900 mt.
- Paint: 17.650 m2
- Guardrail: 900 m.
- In-situ & Precast Traffic Sign Foundations Standart Traffic Signal Foundations: 2.100 Pieces
- Ground Mounted Signboard Foundations: 300 Pieces
- Concrete: 1.500 m3
- In-situ & Precast NewJersey Barrier: 120.000 mt.
- Formwork: 295.000 m2
- Reinforcement: 6.000 Ton
- Concrete: 47.500 m3
- Paint: 250.000 m2